
Manufacturing
Industrial production of precise structural elements for your home using modern equipment.
Complete Construction Process
Navigate through all stages to understand the full scope of building your dream home
Manufacturing Quality
Precision and durability in every detail
CNC Precision
Automated cutting ensures perfect fit of all parts.
Quality Control
Rigorous checks at every stage of production.
Premium Materials
Only high-grade, certified wood is used.
Fast Production
Efficient processes minimize waiting times.
Ready to Start?
Get a free consultation and quote for your project today.
Production Steps
From raw wood to house kit
Wood Selection & Drying
Selection of high-quality timber and chamber drying to the required moisture content (10-12% for glued timber, 18-20% for solid timber).
Requirements
- Moisture control
- Defect sorting
Challenges
- Uniform drying
- Preventing warping
Profiling / Gluing
For Glulam: planing lamellas, applying adhesive, pressing. For Solid Timber: planing and profiling to exact geometry.
Requirements
- High-quality adhesives
- Precise planing
Challenges
- Adhesion strength
- Surface quality
CNC Cutting
Cutting details, cups, grooves, and drilling channels for engineering networks according to the Structural Design project on CNC machines.
Requirements
- Structural Design files
- Machine calibration
Challenges
- Millimeter precision
- Complex nodes
Quality Control & Packaging
Final inspection of geometry and quality, labeling of each part, and protective packaging for transportation.
Requirements
- Checking against specification
- UV protection packaging
Challenges
- Completeness check
- Transport protection
Manufacturing Insights
What to know about the production process

Request Factory Visit
Visit the manufacturing facility if possible. Seeing your house components being made builds confidence and allows you to verify quality standards firsthand.

Verify Wood Moisture Content
Ensure wood is properly dried to 12-18% moisture content. This prevents warping and cracking after installation. Ask for moisture readings documentation.

Production Timeline Buffer
Add 1-2 weeks buffer to the manufacturing timeline. Weather, equipment maintenance, or material delays can happen. Planning ahead reduces stress.

Pre-Delivery Inspection
Inspect and photograph all components before they leave the factory. It's easier to address issues before shipping than after delivery.

Storage Preparation
Prepare proper covered storage at your site before delivery. Protecting components from rain and direct sun during construction is crucial.
Factory Production Advantages
Why factory-made is better

Consistency
Uniform quality across all elements.

Speed
Much faster than on-site cutting.

Durability
Controlled environment prevents weather damage during making.
Start Your Project
Let's turn your dream into reality step by step.
FAQ about Manufacturing
Specifics of this construction phase








