Manufacturing
Stage 2

Manufacturing

Industrial production of precise structural elements for your home using modern equipment.

Complete Construction Process

Navigate through all stages to understand the full scope of building your dream home

Manufacturing Quality

Precision and durability in every detail

CNC Precision

Automated cutting ensures perfect fit of all parts.

Quality Control

Rigorous checks at every stage of production.

Premium Materials

Only high-grade, certified wood is used.

Fast Production

Efficient processes minimize waiting times.

Ready to Start?

Get a free consultation and quote for your project today.

Production Steps

From raw wood to house kit

1

Wood Selection & Drying

medium

Selection of high-quality timber and chamber drying to the required moisture content (10-12% for glued timber, 18-20% for solid timber).

Duration
1-2 weeks

Requirements

  • Moisture control
  • Defect sorting

Challenges

  • Uniform drying
  • Preventing warping
2

Profiling / Gluing

high

For Glulam: planing lamellas, applying adhesive, pressing. For Solid Timber: planing and profiling to exact geometry.

Duration
3-5 days

Requirements

  • High-quality adhesives
  • Precise planing

Challenges

  • Adhesion strength
  • Surface quality
3

CNC Cutting

high

Cutting details, cups, grooves, and drilling channels for engineering networks according to the Structural Design project on CNC machines.

Duration
3-7 days

Requirements

  • Structural Design files
  • Machine calibration

Challenges

  • Millimeter precision
  • Complex nodes
4

Quality Control & Packaging

low

Final inspection of geometry and quality, labeling of each part, and protective packaging for transportation.

Duration
1-2 days

Requirements

  • Checking against specification
  • UV protection packaging

Challenges

  • Completeness check
  • Transport protection

Manufacturing Insights

What to know about the production process

Request Factory Visit
1

Request Factory Visit

Visit the manufacturing facility if possible. Seeing your house components being made builds confidence and allows you to verify quality standards firsthand.

Verify Wood Moisture Content
2

Verify Wood Moisture Content

Ensure wood is properly dried to 12-18% moisture content. This prevents warping and cracking after installation. Ask for moisture readings documentation.

Production Timeline Buffer
3

Production Timeline Buffer

Add 1-2 weeks buffer to the manufacturing timeline. Weather, equipment maintenance, or material delays can happen. Planning ahead reduces stress.

Pre-Delivery Inspection
4

Pre-Delivery Inspection

Inspect and photograph all components before they leave the factory. It's easier to address issues before shipping than after delivery.

Storage Preparation
5

Storage Preparation

Prepare proper covered storage at your site before delivery. Protecting components from rain and direct sun during construction is crucial.

Factory Production Advantages

Why factory-made is better

Consistency

Consistency

Uniform quality across all elements.

Speed

Speed

Much faster than on-site cutting.

Durability

Durability

Controlled environment prevents weather damage during making.

Start Your Project

Let's turn your dream into reality step by step.

FAQ about Manufacturing

Specifics of this construction phase