Assembly
Stage 4

Assembly

Fast and precise installation of your house kit by our experienced team.

Stage 4 of 9
Assembly

Complete Construction Process

Navigate through all stages to understand the full scope of building your dream home

Assembly Process

Watching your home grow

Speed

Walls can be assembled in just a few days.

Accuracy

Strict adherence to assembly drawings.

Clean Construction

Minimal waste and debris on site.

Professional Team

Certified assemblers with years of experience.

Ready to Start?

Get a free consultation and quote for your project today.

Installation Steps

Raising the structure

1

Unloading & Sorting

medium

Accepting the house kit on site, checking completeness, and organizing storage for efficient assembly.

Duration
1-2 days

Requirements

  • Crane
  • Storage area

Challenges

  • Site access
  • Protection from rain
2

Waterproofing First Crown

high

Installing waterproofing material between the concrete foundation and the first wooden beam (strapping beam) to prevent moisture wicking.

Duration
1 day

Requirements

  • Level foundation
  • Quality waterproofing

Challenges

  • Zero level accuracy
  • Anchoring
3

Wall Assembly

high

Layer-by-layer installation of wall beams according to the assembly diagram. Installation of insulation in joints and corner connections.

Duration
1-2 weeks

Requirements

  • Assembly diagrams
  • Fasteners (dowels, screws)

Challenges

  • Vertical alignment
  • Tight joint fit
4

Floor Beams Installation

medium

Mounting of inter-floor or attic floor beams.

Duration
2-3 days

Requirements

  • Load-bearing capacity check
  • Leveling

Challenges

  • Span length
  • Vibration dampening
5

Roof Truss System

high

Installation of the roof skeleton: rafters, ridge beams, and supports.

Duration
3-5 days

Requirements

  • Structural calculations
  • Working at heights

Challenges

  • Complex roof geometry
  • Wind loads

Assembly Best Practices

Expert guidance for smooth installation

Pre-Assembly Organization
1

Pre-Assembly Organization

Sort and organize all components before starting. Label groups by section. This prevents errors and speeds up assembly by 30%.

Weather Protection
2

Weather Protection

Cover assembled sections each day. Even brief rain can damage unprotected wood. Use tarps and ensure good ventilation to prevent condensation.

Quality Over Speed
3

Quality Over Speed

Take time to verify each connection. Rushing leads to mistakes that are expensive to fix. A well-assembled house is worth the extra days.

Daily Progress Photos
4

Daily Progress Photos

Document each stage of assembly. Photos help identify issues early and provide valuable records for insurance and future modifications.

Team Communication
5

Team Communication

Establish clear communication protocols with your assembly team. Misunderstandings cost time and money. Daily briefings keep everyone aligned.

Advantages of Professional Assembly

Quality guaranteed

Warranty

Warranty

We guarantee the structural integrity.

Safety

Safety

Strict safety protocols on site.

Efficiency

Efficiency

Optimized workflows save time.

Start Your Project

Let's turn your dream into reality step by step.

FAQ about Assembly

Specifics of this construction phase